The Largest Construction Companies in Egypt 2026: Public and Private
Egypt's construction market was estimated at about $50.78 billion in 2024 and is expected to reach $75.97 billion by 2029 (a research estimate from an independent market research firm, not an official figure). The sector combines long-established state companies nationalized in the 1960s with private and family companies that built themselves up after the economic opening.
An important note before the numbers
The companies' figures here aren't directly comparable: some companies report annual revenue, some report value of work completed (business volume), and some report backlog (the value of accumulated future contracts). We've noted the type of each figure next to each company so no one compares two figures of different nature as if they were the same thing.
First: the major state-owned companies
The Arab Contractors (Osman Ahmed Osman & Co.)
Founded by Osman Ahmed Osman in 1955 (he later became Egypt's housing minister), it was nationalized in 1961. It is currently a public-sector entity subject to the Public Sector Authorities Law.
- Value of work completed (fiscal year ended June 2025): EGP 48.343 billion (+1.11%)
- Net profit: EGP 1.404 billion
- Number of projects completed: 66 projects
- Backlog: EGP 166.495 billion (41.8% of it foreign contracts)
- Number of employees: about 56,900
Historic projects: the High Dam, the Bibliotheca Alexandrina, the Cairo–Alexandria Desert Road, the 6th of October Bridge, and several airports (Luxor, Sharm El Sheikh, Hurghada). Recent projects: the high-speed rail (in partnership with Orascom and Siemens), the Rod El Farag Axis, the Alexandria Raml Tram (in partnership with Hassan Allam, 2025), the Nouakchott tramway (Mauritania), and the Julius Nyerere hydropower station (Tanzania). The company also owns the Arab Contractors football club.
Petrojet
A state-owned company under the Egyptian General Petroleum Corporation, founded in 1975.
- 2025 business volume: EGP 121 billion (vs. 112 billion in 2024)
- Confirmed backlog through 2029: EGP 246 billion (about $4.7 billion), announced in March 2026
Notable projects: the first Egyptian company to take part in the El Dabaa nuclear power plant project, LNG vessel connection projects, involvement in Saudi Arabia's NEOM project, a $273 million gas pipeline in Oman, and a $160 million power plant in Saudi Arabia. It operates in 28 countries.
Second: the major private and family companies
Orascom Construction
Part of the Sawiris family empire (with Nassef Sawiris as chairman). In September 2025 it moved its primary listing to the Abu Dhabi Securities Exchange (ADX).
- Revenue for fiscal year 2025: $5.05 billion (+55.1%)
- Backlog at end of 2025: $9.03 billion (a record, +18.9%)
- Net profit: $194.8 million (+65.1%)
- Egypt and Saudi Arabia account for 62.2% of the backlog, and the US market (through its subsidiary Weitz) jumped to 32.1%
Most important current project: a consortium with The Arab Contractors and Siemens Mobility to build Egypt's first high-speed rail line, worth $4.5 billion. It is also involved in the Ras Ghareb wind farm (650 MW) and buildings in the New Administrative Capital.
Hassan Allam Group
Founded in 1936, it is now run by the third generation (Hassan Allam and Amr Allam as co-CEOs).
- Backlog: about $6-6.5 billion (estimates vary slightly between sources)
- Number of employees: more than 50,000 across 18 subsidiaries in 10 countries
- A $550 million contract for a residential/commercial project in New Cairo (October 2025)
- A water infrastructure contract in Oman (September 2025)
Concord for Engineering and Contracting
A private Egyptian company founded in 1989, led by a board of 3 founding engineers. Note: there is no documented link to the Sawiris family in the available sources, despite common rumors to that effect — any information about the company's ownership should be verified before publishing.
Notable projects: the Ismailia Tunnel ($988 million, 2016), the Ahmed Hamdi Tunnel ($680 million, 2018), Cairo Metro Line 4 (2019-2020), and a power transmission line in Makkah (2024).
Other prominent companies
- Elsewedy Electric — essentially a global manufacturer of cables and electrical equipment, but it has an active engineering, procurement, and construction (EPC) arm in power plants and substations. 2024 revenue: EGP 232 billion (about $4.58 billion).
- Rowad Modern Engineering (RME) — built the Beni Suef thermal power plant (4,800 MW) and the Benban Solar Park (one of the largest solar parks in the world).
- Other companies of smaller size or with less documented data: Kharafi National, Redcon, CRC Dorra, Samcrete, Madkour Group.
Frequently Asked Questions
Is The Arab Contractors still the largest construction company in Egypt? Historically it was, but comparing current size, Orascom Construction (with $5+ billion in global revenue) is larger as a total figure, although The Arab Contractors is still one of the biggest players locally within Egypt specifically.
Why aren't the figures consistent between companies? Because each company discloses a different measure (revenue, business volume, or backlog) in a different currency (pounds or dollars), which is normal in this sector worldwide, not just in Egypt.
Sources: official company data (Orascom Construction, Hassan Allam), coverage by Amwal Al Ghad, Almal News, Youm7, and Al-Wafd of The Arab Contractors' and Petrojet's results, Global Construction Review, Shore Africa, and Billionaires Africa for international coverage, and the Rasmal website for general market data. Last updated: August 2026.